Home  |  Search Job Results  |  Job Details
Pakistan Intelligence Job Board
Job Details
   
 
Job Summary
Company
Gulf Cement Company

Location
Islamabad

Job Type
Full Time

Years of Experience
4

Education Level
Master's Degree

Career Level
Experienced (Non-Manager)

Salary
Not mentioned
Mechanical Foreman




Requirements

4 years experience



About Us
1979 GCC was established as a public shareholding company in 1977 with paid up Capital AED 300,000,000. 1981 GCC was officially declared open on 28th April 1982 by His Highness Shaikh Saqr Bin Mohd Al Qassimi, Member of the Supreme Council and Ruler of Ras Al Khaimah 1985 Mixed firing started in kiln and calciner after introducing Natural gas firing along with 180 cSt fuel oil 1988 Marine Heavy fuel oil 1000 cSt is also introduced along with 180 cSt and Natural gas. 1992 GCC commissioned a new Rotary Packer along with auto and semi auto loaders in the loading site with 2400 bag per hour Moller – Germany 1994,1997,2001 Micro Mill Project for fine grinding Pet.Coke/Coal,which is needed for Kiln & NSP, by Fuller International – USA 1994 GCC commissioned a new Gas Turbine with rated output of 27.25 MW Germany 1995 Filter Bag House for reducing the dust emission from Kiln and cooler chimney to 25/mm3 , by Fuller International – USA 1996 The company has been awarded the ISO 9002 (Quality Standards Certification) 1996 GCC commissioned an additional clinker truck loading system, by Aumund Germany. 1997 GCC commissioned secondary crushing system for silica rock to produce crushed silica with 10 mm size, by Svedala - UK. 1997 Clinker pre-crushing unit for enhancing the cement mill grinding capacity, by CEMAG GmbH – Germany. 1997 Pet Coke Indirect firing System for feeding kiln and NSP, by CEMAG GMBH - Germany. 1997 KOE Kiln output Enhancement from 3300 t/h to 3800 t/h & Kiln Shell Repair Project, by CEMAG GmbH & IKN GmbH – Germany. 1998-1999 New grinding mill for increasing cement production 70 tons/h, by CEMAG GmbH – Germany. 1999 CCR Automation & monitoring & display of operational parameters with alarm and indications for improving the factory operation and reducing man power cost and faults, by Siemens – Pakistan. 2000 Dome Silo for clinker storage of 110,000 tons in order to reduce clinker dust emission, by Dome Technology Inc - USA. 2001 GCC introduced GGBS production 2000-2001 Multi compartment Silo with a capacity of 5000 tons,by CEMaG GmbH - Germany 2002 The Company has been awarded the ISO 14001 Environmental Standards Certification in 2002. 2002 GCC had acquired a new quarry of silica (Adhan quarry), which could be reserved for a long time and it constitutes 14% of the raw materials. 2003 GCC is certified for ISO 9001:2000 by Bureau Veritas Quality International. 2003 GCC enhanced clinker output from 3800 T/D to 4100 T/D by optimisation process 2003 Wired & Wireless Data Network Project for ensuring safe data flow between the world and every office at GCC, by Avaya Communication – USA 2004 Coal grinding mill with 28 t/h capacity, by F.L.Smith - Denmark 2004 Cement grinding mill project with capacity 115 t/h, by CEMTEC GmbH – Austria 2004 GCC is in the process of installing 6 additional cement/GGBS silos with a total capacity of 25000 tons. 2005-2006 A new clinker production line with a capacity of 7500 t/d will be installed by ThyssenKrupp/India and Polysius AG/ Germany.(GCC becomes the largest clinker producer in UAE)
Bookmark and Share
   
 
Narrow Your Results