Mechanical Foreman
Requirements
4 years experience
About Us
1979
GCC was established as a public shareholding company in 1977 with paid up Capital AED 300,000,000.
1981
GCC was officially declared open on 28th April 1982 by His Highness Shaikh Saqr Bin Mohd Al Qassimi, Member of the Supreme Council and Ruler of Ras Al Khaimah
1985
Mixed firing started in kiln and calciner after introducing Natural gas firing along with 180 cSt fuel oil
1988
Marine Heavy fuel oil 1000 cSt is also introduced along with 180 cSt and Natural gas.
1992
GCC commissioned a new Rotary Packer along with auto and semi auto loaders in the loading site with 2400 bag per hour Moller – Germany
1994,1997,2001
Micro Mill Project for fine grinding Pet.Coke/Coal,which is needed for Kiln & NSP, by Fuller International – USA
1994
GCC commissioned a new Gas Turbine with rated output of 27.25 MW Germany
1995
Filter Bag House for reducing the dust emission from Kiln and cooler chimney to 25/mm3 , by Fuller International – USA
1996
The company has been awarded the ISO 9002 (Quality Standards Certification)
1996
GCC commissioned an additional clinker truck loading system, by Aumund Germany.
1997
GCC commissioned secondary crushing system for silica rock to produce crushed silica with 10 mm size, by Svedala - UK.
1997
Clinker pre-crushing unit for enhancing the cement mill grinding capacity, by CEMAG GmbH – Germany.
1997
Pet Coke Indirect firing System for feeding kiln and NSP, by CEMAG GMBH - Germany.
1997
KOE Kiln output Enhancement from 3300 t/h to 3800 t/h & Kiln Shell Repair Project, by CEMAG GmbH & IKN GmbH – Germany.
1998-1999
New grinding mill for increasing cement production 70 tons/h, by CEMAG GmbH – Germany.
1999
CCR Automation & monitoring & display of operational parameters with alarm and indications for improving the factory operation and reducing man power cost and faults, by Siemens – Pakistan.
2000
Dome Silo for clinker storage of 110,000 tons in order to reduce clinker dust emission, by Dome Technology
Inc - USA.
2001
GCC introduced GGBS production
2000-2001
Multi compartment Silo with a capacity of 5000 tons,by CEMaG GmbH - Germany
2002
The Company has been awarded the ISO 14001 Environmental Standards Certification in 2002.
2002
GCC had acquired a new quarry of silica (Adhan quarry), which could be reserved for a long time and it constitutes 14% of the raw materials.
2003
GCC is certified for ISO 9001:2000 by Bureau Veritas Quality International.
2003
GCC enhanced clinker output from 3800 T/D to 4100 T/D by optimisation process
2003
Wired & Wireless Data Network Project for ensuring safe data flow between the world and every office at GCC, by Avaya Communication – USA
2004
Coal grinding mill with 28 t/h capacity, by F.L.Smith - Denmark
2004
Cement grinding mill project with capacity 115 t/h, by CEMTEC GmbH – Austria
2004
GCC is in the process of installing 6 additional cement/GGBS silos with a total capacity of 25000 tons.
2005-2006
A new clinker production line with a capacity of 7500 t/d will be installed by ThyssenKrupp/India and Polysius AG/ Germany.(GCC becomes the largest clinker producer in UAE)
 |
 |
| |
|
|
|